What We Do

Services

Everything we do, from a new deck to fixing the one you've already got.

HomeServices

Everything we take on

Every job below is one we do ourselves across Olive Branch.

Custom Deck Design

We draw up the layout before we cut a single board, working around your slope, your back door, and where the sun sits at four in the afternoon. Multi-level decks, built-in benches, and stair placement all get worked out on paper first so there are no surprises once framing starts.

Deck Installation

We frame new decks with pressure-treated joists spaced to match the decking you choose, then set footings below frost depth so the structure doesn't heave with the clay soil. Ledger boards get bolted straight into the house framing, flashed to keep water from getting behind the siding.

Deck Repair

Soft spots in the decking, wobbly railings, and stairs that flex under weight usually trace back to a rotted ledger board or a footing that's shifted. We pull up what's failed, check the framing underneath, and only replace what actually needs it instead of rebuilding the whole deck.

Deck Staining & Sealing

Pressure-treated pine has to dry out for a few weeks before it'll take a stain to hold properly, and we test the wood's moisture before we ever open a can. We pressure wash first, let it cure, then apply a penetrating stain or clear sealer that holds up to Mississippi sun instead of peeling by August.

Composite Decking Installation

Composite boards don't rot, but they still require proper joist spacing and hidden fastener systems to lie flat and stay quiet underfoot. We install brands rated for our climate and leave the gapping manufacturers specify for expansion in the heat.

Deck Railing Installation & Repair

Loose balusters and a wobbly top rail are almost always a post that's lost its lag bolts, not a design problem. We rebuild railings to current code height and spacing, whether you want wood pickets, cable rail, or aluminum.

Deck Resurfacing

If your frame is still solid but the decking boards are cupped, splintering, or gray, we strip the old boards and put down new decking on the existing joists. It's a faster, cheaper way to get a deck looking new without touching the substructure.

Screened-In Porch & Deck Combos

Some homeowners want part of the deck open and part of it screened off from mosquitoes, especially with how the bugs get here in July. We frame the screened section with its own roof line and tie it into the open deck so it reads as one structure, not two projects stapled together.

Deck Demolition & Removal

Old decks with rotted ledger boards or undersized footings sometimes aren't worth saving, and we'll tell you that instead of patching something that's going to fail again in two years. We tear it out, haul off the lumber and old concrete footings, and clear the site for whatever comes next.

Pergolas & Deck Shade Structures

A deck that faces west gets brutal by four o'clock in July, and a pergola built into the deck framing cuts that heat without closing the space in. We size the rafters and posts to carry real weight, not just look good in a photo.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Olive Branch, MS

Deck work covered across Olive Branch and the surrounding towns.

Olive Branch, MS
Memphis, MS
Bartlett, MS
Southaven, MS
Collierville, MS
Germantown, MS
Horn Lake, MS
Hernando, MS
Senatobia, MS
Byhalia, MS
Nesbit, MS
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck?
Most decks over 30 inches off the ground, or attached to the house, require a building permit that covers footing depth and railing height. Permit requirements and application handling are part of deck installation service, so the homeowner doesn't have to deal with the county directly.
How long does it take to build a deck?
A standard ground-level or single-story deck usually takes one to two weeks from framing to final decking, weather permitting. Multi-level decks with stairs, built-in seating, or a screened section can run three to four weeks.
Can you build a deck to fit my budget?
Deck size, decking material, and railing style are the three biggest levers on price, so a written estimate usually includes options at different price points. Pressure-treated pine with a simple picket railing costs less than composite decking with cable rail or a multi-level layout.
Do you guarantee your deck work?
Workmanship on deck installation and repair is guaranteed against defects in framing and construction, separate from manufacturer warranties on decking material or hardware. Specific warranty terms are included in the written estimate before work starts.
Who will I be dealing with during the deck project?
The same crew that measures the site and bids the job is the crew that shows up to frame and finish the deck. Any changes mid-project, like swapping decking material or adjusting railing style, get discussed directly rather than through a call center.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite decking from brands like Trex or TimberTech are all standard options for deck installation. Composite costs more upfront but skips the annual staining that pressure-treated wood needs to hold up in Mississippi humidity.
Can I still use my yard while the deck is being built?
Most of a deck build happens in the footprint of the deck itself, so the rest of the yard stays usable, though a delivery truck and tools take up driveway space for a day or two. Old deck demolition creates more temporary mess than new construction, especially if there's a concrete footing to break out.
What do I need to do to prepare for a deck installation?
Clearing furniture, grills, and potted plants off the existing deck or the build area is the main prep needed before deck work starts. Anything below the deck footprint, like sprinkler lines or buried cable, should get flagged ahead of digging footings.
What happens if you find rot or a bad footing once the old deck comes off?
Hidden rot in ledger boards or an undersized footing sometimes only shows up once the old decking is pulled up, and that gets flagged before any new framing goes in. Any change to the scope or price from unexpected framing repair is discussed before the work continues, not added to the final invoice as a surprise.
How do I take care of a new deck once it's built?
Pressure-treated wood decking should get restained every two to three years, sooner if it faces full afternoon sun, while composite decking just gets washed down occasionally. Keeping gutters and downspouts from dumping water directly under the deck footings extends the life of the frame either way.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (662) 440-7898